When people are planning to renovate their homes, one of the very topmost questions they ask is how long does it take to complete full house renovation? Even though there are no specific answers to that, there are a number of factors that can influence or determine how long it will take for the renovation process to take complete.

Planning your complete full house renovationhome renovation process

While planning to renovate, there are two factors that must be worked on, and they are the planning aspect and the execution or construction aspect. The planning aspect has to do with coming up with a design or model of the building you want to have at the end, measuring the place you want to renovate to determine the actual size, and getting a building permit from your city.

Then, the execution or construction stage has to do with the complexity of the renovation that you want to carry out. In situations where you have to replace the electrical wiring, put new tiles, mould and/or work on the cabinetry, then the renovation will be running into several weeks.

Structural work for house renovation

Typically, when renovations are about to begin, as said earlier, knowledge of the site to work on is important. You need to do a field analysis of the structure or building you are working on. The recording of the electrical work, mechanical and plumbing aspect of the building, as well as other vital information you will need may require 1 to 2 weeks to complete.

Afterwards, designing what you want may require between 4 to 8 weeks. This is because you will have to criticize it to see if it actually fits into what you are expecting. And then, getting the approval for permit could take several weeks also. If you are just renovating a room or maybe your bathroom, it could take you about 2-4 weeks to get that done.

More so, the execution stage is usually the most tasking in all. Everything you have done in the planning stage; your designs, what you imagined and so on are put to test here. This is why adequate time and care must be given here so that all the effort and resources you have put into the renovation process are not shattered.

When you are embarking on a complete renovation of a building, that can take you several months to complete, especially if you are the one handling it.  But it has been found out that if you employ the assistance of a contractor, the duration to complete task may be reduced.

Another factor that could help determine the time it will take to complete a renovation process has to do with the size of the facility or structure you are working on. While you could carry on the renovation with fun if it is not a complex one, the aspect of electrical fittings or plumbing work that need to be upgraded or replaced will definitely require more time and expertise to handle them.

So, before you conclude on the time it will take you to complete a full house renovation, you must consider the complexity of the job that is to be done, as the more the complexity, the more the time it will require to complete the renovation.